GoldJune 1997 · San Juan

The drill hole that foreshadowed Veladero

In mid-1997, Argentina Gold reports drill hole V97-55 at Filo Federico: 168 meters averaging 2.7 grams of gold per tonne, open at depth. Eight years later, San Juan inaugurates its great gold mine there.

Drill rig on stony ground, at the foot of mountains with patches of snow
Drilling work at Veladero, San Juan, published in January 1999. Photo: Issue 232, January 1999.

The story begins in September 1994, when Argentina Gold and American Barrick acquire the concessions of Veladero and Del Carmen, areas of IPEEM, the mining agency of San Juan. The agreement, with an initial investment of US$17 million, is signed at Government House before President Carlos Menem.

In the hole, a two-meter interval, between depths of 130 and 132 meters, reaches 39 grams per tonne. The campaign totals 2,430 meters and is suspended until September because of the weather. In July 2000, Ricardo Martínez, general manager of Homestake in Argentina, recounts that this drilling begins in mid-May and that snow holds the team back for about twenty days.

Over time it comes to be called the discovery hole. The April 2001 issue adds that the potential of the area is fully recognized with hole 76, at Amable. On October 11, 2005, more than 1,700 guests attend the inauguration of the production stage.

Dark slope with an open trench and, behind it, snow-covered mountains
Trenches and drill pads at the northwest target of Veladero, San Juan, in July 1997. Photo: Issue 214, July 1997.

All the moments

  • Gold
  • Silver
  • Copper
  • Lithium
  • Iron
  • Potash
  • Other minerals
  • Laws, institutions and the magazine