Other mineralsMay 8, 1980 · Mendoza

Uranium from Mendoza for the nuclear power plants

The National Atomic Energy Commission (CNEA) contracts Minera Sierra Pintada to mine the deposit and build a concentrate plant. The agreement is signed at Government House in Mendoza on May 8, 1980. The complex, operated by the CNEA, produces until the 1990s.

Aerial view of roads, buildings and a watercourse in the mountain landscape of Sierra Pintada
Aerial view of Sierra Pintada, in Mendoza. Photo: Issue 109, April 1987.

The signing brings together in the Situation Room the president of the CNEA, Vice Admiral Carlos Castro Madero, and the president of the company, Mario Galimberti, before Governor Rolando José Ghisani and the ambassador of France. The contract provides for a ten-year term, an initial investment of US$200 million and 700 tonnes of concentrate per year from early 1983.

The magazine traces the search back to 1956, when the CNEA detects uranium anomalies at Cuesta de los Terneros. One month after the signing, the works have not yet begun, and the newspaper Mendoza links the delay to the price of the ore. In December 1982, the CNEA reports that there were no valid bids for the award of the complex.

The industrial complex, operated by the CNEA, extracts ore until 1995, and the plant works with stockpiled material until 1997. In 2019 the environmental remediation begins. In 2026, national and Mendoza authorities visit the site, and the magazine puts the uranium produced at 1,600 tonnes.

Stepped benches of the Sierra Pintada quarry under a clear sky
Benches of the Sierra Pintada complex, in Mendoza. Photo: Issue 553, June 2026.

All the moments

  • Gold
  • Silver
  • Copper
  • Lithium
  • Iron
  • Potash
  • Other minerals
  • Laws, institutions and the magazine