CopperDecember 1981 to mid-1982 · La Rioja
Famatina opens to the world
In December 1981, the national government calls an international tender to explore the Nevados del Famatina, in La Rioja, one of the country’s large molybdenum and copper prospects. The opening of bids is set for July 1982, although that year it is suspended.

Decree 2234, of December 18, 1981, approves the tender documents, and Resolution 154 sets the opening for July 30, 1982, at 10 a.m. The area totals 2,192 hectares, 35 kilometers from Chilecito. The mines belong to the Dirección General de Fabricaciones Militares. The bidder bears the exploration risk, and mining requires a partnership with that agency.
By then, the deposit has 36 drill holes and 10,677 meters drilled. Between March and April 1982, Colonel Arnoldo Rolando presents at a seminar a Japanese study that calculates 202 million tonnes of mineable ore, with molybdenum and copper.
Resolution 54/82, signed by Jorge Luis Paquién, suspends the tender without a date, “in view of the circumstances the country is going through.” Yacimientos Mineros Riojanos calls another, with the opening in March 1992, and CRA Exploration signs in February 1994. In 2007, the magazine reports the withdrawal of Barrick, which had been exploring the area since 2005.
