Patagonia Gold 2019 financial results

2 mins min lectura
Compartir:

Patagonia Gold Corp. announced its audited results for the fiscal year ended December 31, 2019.

Highlights

  • Revenue of US$21.9 million and gross profit of US$5.5 million in YE 2019.
  • In February 2019, the heap leach operations at Lomada and Cap Oeste were placed on care and maintenance.
  • Residual production at Cap Oeste of 7,796 ounces of gold and 237,727 ounces of silver and at Lomada of 3,969 ounces of gold.
  • Production at Mina Martha of 232 ounces of gold and 65,620 ounces of silver.
  • Completion of the Reverse Takeover transaction with Hunt Mining Corp. on July 24, 2019.
  • At Calcatreu, the exploration program during 2019 was mostly focused on surface work, with a total of  41.28 line kilometers of Pole-Dipole geophysical surveying over the Nelson, -Castro Norte, Fiero, Sabrina and Viuda de Castro areas, plus 121.5 line kilometers of gradient IP geophysics over Nelson, Sabrina and Mariano. An additional 1,687.2 km of ground magnetic surveying, covering 55.44sq km, were completed in the project covering several targets including V49 and Nelson.
  • Initiated a pre-feasibility study at Cap Oeste to assess the potential technical and economic extraction of the higher grade portion of the current mineral resources.
  • Received the final approval closure plan for Lomada on November 2019 and started with the works of remediation in late 2019.

Christopher van Tienhoven, CEO commented: “Despite the closure of Lomada and Cap Oeste in February 2019, the projects continued to generate residual production from the heap leach pads which helped the Company to reduce its commercial indebtedness.  In addition, the successful completion of the Reverse Takeover with Hunt Mining will enable the Company to advance the development of the high-grade Cap Oeste Underground Project with processing at the Martha plant.”

First Quarter 2020 Financial Results Release

The Company continues to rely on the temporary blanket relief for market participants from certain regulatory filings published by Canadian securities regulators on March 23, 2020 as a result of the COVID-19 pandemic.

 The Relief provides the Company with a 45-day extension to file its financial statements and MD&A for the period ended March 31, 2020 (the “Q1 Filings”). Patagonia expects to file the Q1 Filings on or before July 16, 2020.

Publicado por: Panorama Minero

Categoría: Noticias

¿Querés recibir noticias del sector y de las iniciativas de Panorama Minero?


Suscribite a nuestro boletín.

Imagen ilustrativa para la noticia: La minería se consolida como motor clave del empleo formal en la provincia de Jujuy | Panorama Minero

La minería ha consolidado su posición como la fuente más dinámica de empleo privado formal en Jujuy durante la última década. Según un informe del mercado laboral que abarca 2015–2024, el sector registró un crecimiento acumulado del 52% en empleo, superando a la industria en creación de puestos, salarios y demanda de mano de obra calificada.

Imagen ilustrativa para la noticia: ABB Argentina obtiene certificación internacional "Mission to Zero" | Panorama Minero

La planta industrial de Electrificación en Bella Vista (provincia de Tucumán) recibió la certificación global de sustentabilidad “Mission To Zero” de ABB, estando entre los primeros 35 en lograrlo de los 170 sitios productivos que tiene ABB en el mundo.

Imagen ilustrativa para la noticia: Santa Cruz: Targa expande el proyecto El Zanjón  | Panorama Minero

Targa Exploration Corp. anunció que se han otorgado tres concesiones de exploración adicionales para el proyecto de oro y plata El Zanjón, ubicado en la provincia de Santa Cruz.

Imagen ilustrativa para la noticia: San Juan: NGEx anuncia resultados sobresalientes en lunahuasi | Panorama Minero

NGEx Minerals informó nuevos resultados de perforación de alta ley de cobre-oro-plata provenientes de su programa de perforación Fase 4 en el proyecto Lunahuasi, en la provincia de San Juan, donde actualmente operan ocho equipos de perforación.