Unico Silver: New Discoveries Reinforces District Potential at Joaquin

3 mins min reading
Unico Silver: New Discoveries Reinforces District Potential at Joaquin
Unico Silver: New Discoveries Reinforces District Potential at Joaquin
Share:

In Santa Cruz province, high-grade results from La Morocha, La Negra SE and La Morocha SE confirm Joaquin as a district-scale silver-gold system.

By Panorama Minero

Unico Silver Limited reported assay results for 21 holes (3587m) as part of an ongoing drill program at the Company’s 100%-owned Joaquin Project in Santa Cruz province. This brings total reported assays since drilling commenced September 2025 of 31 holes for 5113m.This includes exceptional high-grade silver gold intercepts at three prospects – La Morocha, La Negra SE and La Morocha SE.

Managing Director Todd Williams stated: “The Joaquin Project continues to deliver exceptional results. Infill drilling at La Morocha has confirmed that bonanza-grade silver mineralisation—typical of that previously mined underground by Pan American Silver—extends far closer to surface than previously understood. A standout intercept of 1.8 metres at 8,335gpt (grams per tonne) AgEq (Silver Equivalent) from 52 metres demonstrates the potential for early, near-surface ounces and strengthens the case for open-pit development.

At La Negra SE, step-out drilling has extended mineralisation a further 200 metres to the southeast, with hole JDD047-25 returning 34.7 metres at 110 gpt AgEq, while infill holes continue to intersect broad zones of silver-gold mineralisation close to surface, including 43 metres at 256 gpt AgEq (JDD048-25) and 71 metres at 131 gpt AgEq (JDD063-25). Deeper drilling has successfully extended mineralisation to over 160 metres vertical, with 34 metres at 170 gpt AgEq (JDD056-25), and the system remains open in all directions.

Early follow-up drilling at La Morocha SE has also confirmed a new discovery, with strong mineralisation returned across multiple holes, including 20 metres at 160 g/t AgEq (JDD070-25). Visible gold continues to be observed in several recent holes with assays pending, highlighting the robust scale and continuity of this emerging district-wide system. With multiple discoveries and shallow, high-grade intercepts now defined across the Joaquin district, Unico is rapidly advancing the Company’s PLUS 150 and BEYOND 300 development and exploration growth strategies”.

This forms part of a 30,000m drill program focused on regional exploration and new discoveries, and the delineation of high-confidence, pit-constrained, free-milling silver ounces at Joaquin, with an updated JORC Mineral Resource Estimate on track for delivery this year following the receipt of outstanding drill assays.

Next Steps include:

Focus of the current 30,000m fully funded drill program will include:

  • La Negra SE and La Morocha SE extensional drilling focusing on expanding the mineralised footprint to the SE and at depth, in addition to infill drilling shallow high-grade zones to Indicated resources status.

  • Regional scout drilling targeting the covered extensions of both vein trends, exploring for repetitions of the high-grade mineralised shoots.

  • Interim Mineral Resource Estimate is anticipated 3 weeks following the receipt of the final assays from the currently completed drill holes at La Negra SE and La Morocha SE.

  • Geotechnical drilling to support open pit mine design input parameters.

  • Ongoing mapping, soil and rock chip sampling expanding the current area of interest to adjacent untested vein trends.

Published by: Panorama Minero

Category: News

Illustrative image for the news: “We see an opportunity driven by the growth of the mining sector” | Panorama Minero

“We see an opportunity driven by the growth of the mining sector”

With extensive operations in Mexico and the United States, Grupo México Transportes outlines how technological evolution, artificial intelligence, and logistical integration are redefining freight rail transport. In conversation with Panorama Minero, its CEO, Bernardo Ayala, explains the scope of these innovations and their potential in Argentina.

Read more

Join our mining community!


Subscribe to our newsletter for exclusive news, insights, and updates on the mining industry and Panorama Minero's latest initiatives.

Illustrative image for the news: Gualcamayo receives RIGI approval | Panorama Minero

Minas Argentinas projects 30 years of development and employment for the mine located in the Jáchal department, in the north of San Juan province.

Illustrative image for the news: Catamarca plans a strategic mining laboratory | Panorama Minero

This initiative is moving forward in coordination with the National University of Catamarca (UNCA), within the framework of the transfer process and the new restructuring of Yacimientos Mineros de Agua de Dionisio (YMAD), a step that will grant the province majority control over the management of the state-owned mining company, together with the National University of Tucumán (UNT).

Illustrative image for the news: From political endorsement to engineering: PSJ defines its energy access | Panorama Minero

It signed an agreement with Distrocuyo to begin studies that will allow the construction of a new 220 kV transmission line and a transformer station in the high mountains of Mendoza. In this way, they aim to organize the project’s engineering and reduce uncertainty in an operation with high energy demand.