Blue Sky Uranium Step-Out Drilling Program Confirms Expansion at Ivana Deposit, Amarillo Grande Project

2 mins min lectura
Compartir:

Blue Sky Uranium Corp. informed that results from the recently completed reverse circulation (RC) drilling program have confirmed the southern expansion of the Ivana Uranium-Vanadium deposit on its wholly-owned Amarillo Grande Uranium-Vanadium project in Rio Negro province.

Analytical results have been received to date from all 61 holes drilled (totaling 1,043 metres) in the recently completed RC drilling program. They demonstrate that the Ivana Uranium-Vanadium deposit extends more than 1,000 metres to the south of the current mineral resource. Highlight analytical results are compiled in Table 1 below.

amarillotabla

«We are pleased that drilling in the Ivana uranium-vanadium deposit area has demonstrated it is open to expansion outside of the current mineral resource” stated Nikolaos Cacos, Blue Sky President & CEO. “Blue Sky continues to advance high-priority targets in the Ivana area while progressing the processing design and metallurgical test work to support a PEA.”

The Company continues to advance with its ongoing mineralogical, metallurgical, and process engineering studies at the Saskatchewan Research Council (SRC) under the guidance of the Company’s Technical Advisor, Chuck Edwards P.Eng. The objectives of the work at SRC include confirming the balance of uranium and vanadium in the ore preparation, and optimizing the leach extraction rate and recovery, in support of a Preliminary Economic Assessment (PEA). The work will include QEMSCAN® quantitative mineralogy testing and customized leach experiments. Preliminary QEMSCAN® mineralogy was conducted in June and has aided in the design of the current metallurgical and process testing.

 

About the Amarillo Grande Project

The Company’s 100% owned Amarillo Grande Uranium-Vanadium Project in Rio Negro Province, is a new uranium district controlled by Blue Sky. The Project includes several major target areas over a regional trend, with uranium and vanadium mineralization in loosely consolidated sandstones and conglomerates, at or near surface. The area is flat-lying, semi-arid and accessible year-round, with nearby rail, power and port access. The Company’s strategy includes delineating resources at multiple areas for which a central processing facility could consolidate production. The Ivana deposit is the cornerstone of the Project and the first area to have a NI 43-101 Inferred Resource estimate, which includes 23.9 million tonnes averaging 0.036% U308 and 0.019% V2O5, containing 19.1 million pounds of U3O8 and 10.2 million pounds of V2O5, at a 100 ppm uranium cut-off.

Publicado por: Panorama Minero

Categoría: Noticias

¿Querés recibir noticias del sector y de las iniciativas de Panorama Minero?


Suscribite a nuestro boletín.

Imagen ilustrativa para la noticia: Catamarca proyecta un laboratorio minero estratégico  | Panorama Minero

Esta iniciativa avanza en articulación con la Universidad Nacional de Catamarca (UNCA), en el marco del proceso de traspaso y nueva conformación de Yacimientos Mineros de Agua de Dionisio (YMAD), instancia que otorgará a la provincia control mayoritario en la conducción de la empresa minera estatal junto a la Universidad Nacional de Tucumán (UNT).

Imagen ilustrativa para la noticia: Del aval político a la ingeniería: PSJ define su acceso energético | Panorama Minero

Firmó un acuerdo con Distrocuyo para iniciar los estudios que permitan la construcción de una nueva línea de 220 kV y una estación transformadora en la alta montaña mendocina. De esta manera buscan ordenar la ingeniería del proyecto y reducir la incertidumbre en una operación de alta demanda energética.

Imagen ilustrativa para la noticia: Catamarca asume el control mayoritario de YMAD  | Panorama Minero

El Gobierno de la provincia de Catamarca y la Universidad Nacional de Tucumán (UNT) concretaron la firma de convenios estratégicos que completan el proceso de transferencia de Yacimientos Mineros de Agua de Dionisio (YMAD).