Lindero project – Construction decision in 2017 and investment in exploration activities

1 min min lectura
Compartir:

Operated by Fortuna Silver Mines, Inc. the Lindero Project, located in Salta province, has Proven and Probable Mineral Reserves of 82.5 Mt containing 1.7 Moz of gold, in addition to Inferred Resources of 46.5 Mt containing 0.6 Moz of gold as detailed in the 2016 Feasibility Study.

Fortuna continues to conduct tradeoff metallurgical tests and detailed engineering revisions to optimize the 2016 Feasibility Study to assist a construction decision in the third quarter of 2017. Initial results for the various components of the optimization are expected to be released in March 2017.

The 2017 Brownfields exploration budget at Lindero is US$450,000 which includes investigating the economic potential of the Arizaro gold-copper porphyry target that lies within the concession block. The work program includes surface mapping, re-logging of approximately 8,000 meters of core and preliminary metallurgical tests.

Publicado por: Panorama Minero

Categoría: Noticias

¿Querés recibir noticias del sector y de las iniciativas de Panorama Minero?


Suscribite a nuestro boletín.

Imagen ilustrativa para la noticia: Jujuy: Un foro permitió integrar voces de la universidad, empresa y comunidades | Panorama Minero

Se logró en la jornada “Minería, Patrimonio y Comunidad: Diálogos para una transición sostenible en la Puna”, encuentro organizado en el anfiteatro de la Facultad de Ingeniería por los medios especializados Prensa GeoMinera y Jujuy Económico, donde se contó con la participación de académicos, estudiantes, autoridades universitarias, funcionarios y representantes del sector minero.