Lilac: Successful Operations of Lithium Demonstration Plant in Jujuy

3 mins min reading
Lilac: Successful Operations of Lithium Demonstration Plant in Jujuy
Lilac: Successful Operations of Lithium Demonstration Plant in Jujuy
Share:

Lilac, a leading provider of direct lithium extraction (DLE) technology, reported the successful operation of its lithium extraction demonstration plant in Jujuy.

By Panorama Minero

Lilac, a leading provider of direct lithium extraction (DLE) technology, announced the successful operations of its lithium extraction demonstration plant in Jujuy province. The plant featured Lilac’s latest fourth generation ion exchange (IX) technology, achieving 91% lithium recovery from salar brine with a lithium grade of 300 mg/​L and a 99.4% overall impurity rejection rate. The demonstration plant leveraged a lithium extraction module built with 100% off-the-shelf equipment, matching the commercial design with a vessel sized at approximately one-third commercial scale. This achievement marks a critical milestone in scaling up Lilac IX technology, demonstrating excellent lithium recovery, purity, and IX material cycle life throughout operations.

The plant highlights the capabilities of Lilac’s technology and team to deliver results under challenging field conditions with a system design that mirrors commercial scale. It operated continuously 24⁄7 in a remote desert location at 4,000 meters above sea level and leveraged the same controls and automation system planned for commercial deployment.

Key Performance Metrics:

• Lithium Recovery: 91%

• Overall Impurity Rejection: 99.4%

• Plant Throughput*: 42 tonnes LCE/​year

• IX Vessel Size: ~1/3 of commercial scale

• Eluate Lithium Concentration from DLE**: 2,300 mg/​L

* Equivalent throughput if run continuously for 1 year

** Raw eluate prior to any further downstream concentration or treatment

Lithium recovery at the Jujuy demonstration plant was stable, averaging 91% and exceeding the commercial plant design basis of 90%. The Lilac IX media delivered excellent selectivity of lithium over major cations such as sodium, magnesium, calcium, potassium, and boron. Notably, the Lilac IX process achieved 99.9% rejection of sodium, the primary impurity in the feed brine. The overall impurity rejection rate was 99.4%. Hatch was on-site to witness the operation of the demonstration plant and verified its performance.

The consistently high and stable eluate purity supports a cycle life estimate of over 4,000 IX media cycles on the Jujuy brine, which is consistent with the performance seen at mini-pilot scale.

“The success of our Jujuy demonstration plant is a major validation of Lilac’s technology and team,” said Raef Sully, chief executive officer of Lilac. ​“We’ve proven that our Gen 4 ion exchange technology can meet and exceed the plant design basis under real-world conditions. This milestone advances Lilac toward full commercial deployment and strengthens our ability to help producers bring new lithium projects online.”

Published by: Panorama Minero

Category: News

Join our mining community!


Subscribe to our newsletter for exclusive news, insights, and updates on the mining industry and Panorama Minero's latest initiatives.

Illustrative image for the news: San Juan consolidates its Leadership in Metal Mining with Strong Exploratory Activity | Panorama Minero

San Juan is positioning itself as one of the leading provinces in metal mining in Argentina, with exploration as a central pillar of its present and future development. Exploratory activity plays a key role in the identification of resources, the evaluation of their economic viability, and the reduction of risks prior to productive investment.

Illustrative image for the news: Organullo Project: Latin Metals accelerates its Search for new Partners | Panorama Minero

Latin Metals announced this week its intention to position the project located in the province of Salta during 2026, with the aim of finding a new partner and advancing with Phase 1 drilling. The announcement was issued just days before the expiration of the contract with AngloGold Ashanti, on January 27.

Illustrative image for the news: Hidro-Grubert, a Palfinger Company: From Pioneers and Leaders to Strategic Partners | Panorama Minero

HIDRO-GRUBERT together with PALFINGER are preparing to take a qualitative leap in the mining business. With full integration into the Austrian group and a proposal that combines local production, advanced technology and after-sales service nationwide, the leading company in the truck-mounted crane segment foresees a strong 2026.

Illustrative image for the news: Mining Emerges as a Key Driver of Formal Employment in Jujuy Province | Panorama Minero

Mining has consolidated its position as the most dynamic source of formal private employment in Jujuy, over the past decade. According to a labor market report covering 2015–2024, the sector recorded 52% cumulative employment growth, outpacing industry in job creation, wages, and demand for skilled labor.