Mining Project
Hierro Indio
- Address
- Mendoza
- Stage
- Exploración
- Minerals
- Iron

General Information
- Address
- Mendoza
- Location
- Google Maps
Description
In 2023, a drilling campaign was carried out on 5% of the project, where about 5 MT of iron oxide could be determined.
An Economic Prefeasibility Study is planned for 2024, as well as the approval of the Environmental Impact Study for exploitation by the Legislature of Mendoza.
In production stage, Hierro Indio could supply 30% of the iron imported by Argentina (Our country has no iron production)