Back to compendium

Mining Project

Calcatreu

Address
Río Negro
Stage
Production
Minerals
Copper · Gold
Calcatreu

General Information

Address
Río Negro
Location
Google Maps

Description

• High-grade, low sulphidation, epithermal gold-silver system - Gold-silver mineralization outcrops from surface and is contained in quartz and calcite veins and stockwork between 1 m to 5 m in width. At least 11 significant vein systems across the property. • In January 2026, Patagonia Gold Corp. announced successful commencement of leaching operations. This milestone represents a significant advancement as the Project transitions into its gold recovery cycle. • The initiation of leaching activities follows the completion of construction, commissioning of key infrastructure, and the placement of mineralized material on the heap leach pad. • The Company has over 91,300 tonnes of material from the Veta 49 pit, consisting of 73,300 tonnes crushed and stockpiled, and 18,800 tonnes stacked on the leach pad.

Processing

Lixiviación en montón

Resources & Reserves

  • 690,000 gold equiv ounces (indicated resource) and 343,000 gold equiv ounces (inferred resource)

Related companies

Investor

  • PATAGONIA GOLD100%

Operator

  • MINERA CALCATREU S.A.U100%

Project map