1982 · Jujuy

1982: the war cuts off the tin route

The issue dated March 1982 closes while the Malvinas conflict is under way and places it on the cover. The blockade interrupts the smelting in England of the ore from Mina Pirquitas, which must urgently set up its own metallurgy in the country.

Dry valley with waste dumps, low buildings and hills in the background at the Pirquitas deposit
The Pirquitas deposit, in Jujuy, in a 1997 article. Photo: Issue 219, December 1997.

The editorial of issue 56 sets out the position of the editorial staff, and another article warns about the interruption of trade with the European Economic Community. Two months later, issue 58 reports that the Undersecretariat of Mining suspends, with no new date, the Nevados del Famatina tender scheduled for July 30.

The Pirquitas case becomes known later. The Jujuy mine sent its concentrates to an English smelter, Capper Pass, and received the metals back. In a 1986 letter, director Alberto Omar Bianco estimates the production held in England at almost six months.

In 1987, the chairman of the board, José Javier de la Cuesta Ávila, a contributor to the magazine in 1982, describes the solution: Cuprífera and Estansa form a local metallurgical area, less effective than the English one. The investments add debt in 1984 and 1985. In 2004, the same author maintains that the blockade was partially overcome.