Mining Project
Pozuelos - Pastos Grandes (Proyecto PPG)
- Address
- Salta
- Stage
- Feasibility
- Minerals
- Lithium
- Remaining Life
- 25 Years

General Information
- Address
- Salta
- Location
- Google Maps
Description
• Throughout 2024, the company has made significant progress in the construction of the auxiliary facilities that will provide logistical and operational support to the project. • Ganfeng is working on the development of the detailed engineering for the wells and ponds. A conceptual design for the plant engineering has already been completed, which serves as the basis for planning and the detailed development of the processing facilities to be built in the future.
Average Annual Production
40,000 tonnes of lithium carbonate - 12,000 tonnes of lithium hydroxid.
Resources & Reserves
- 11.09 MT LCE (Lithium Carbonate Equivalent) in measured, indicated and inferred resources
Related companies
Investor
- GANFENG LITHIUM100%
Operator
- LITHEA INC100%