Cerro León Mineral Resource Estimate increases to 162 Moz Silver Equivalent

2 minutes
Cerro León Mineral Resource Estimate increases to 162 Moz Silver Equivalent
Cerro León Mineral Resource Estimate increases to 162 Moz Silver Equivalent
Compartir:

Unico Silver Limited announced a JORC Mineral Resource Estimate (MRE) for the Company’s 100%-owned Cerro Leon Project in Santa Cruz province.

By Panorama Minero

Highlights include:

  • Substantial increase to global mineral resources

  • Cerro Leon global resource now stands at 31Mt at 161gpt silver equivalent (AgEq) for 162 Moz AgEq, up from 93Moz AgEq representing a 73% increase in ounces from the May 2023 MRE

  • MRE excludes the Joaquin Foreign Estimate (2013) of 73 Moz AgEq, with historical production of 4.3Moz Ag by Pan American Silver from 2019–2021.

  • The updated MRE is underpinned by 20,456 m of new drilling completed during 2024-2025, with discovery cost of USD 10c per AgEq ounce.

Maiden oxide resource exceeds PLUS 150 Exploration Target

  • Free-milling resources (oxide and transitional): 8.1 Mt @ 171 g/t AgEq for 45 Moz AgEq exceeds Exploration Target set for the Cerro Leon project.

  • Over 67% in Indicated category, supporting early-stage feasibility work and mine planning.

High-grade mineralisation is open at depth and along strike at multiple prospects

  • At all prospects, MRE is limited by drilling and high-grade mineralised shoots remain open to depth and along strike.

Managing Director Todd Williams commented:

“This updated resource is a defining milestone for Unico. We’ve grown Cerro Leon from a legacy asset into a district-scale silver system, now hosting 162 million silver equivalent ounces. This includes over 45 million ounces of open pit, free-milling material — surpassing the upper end of our PLUS 150 Exploration Target set for the Cerro Leon project in June 2025. Importantly, 67% of those free-milling ounces are now in the Indicated category, giving us a solid foundation for the maiden Scoping Study”.

“With Joaquin’s updated MRE due shortly, and both projects delivering new and evolving discoveries, we now have clear line-of-sight to +250 million ounces of AgEq — and a platform to build toward our longer-term BEYOND 300 strategy”.

Publicado por: Panorama Minero

Categoría: Noticias

¿Querés recibir noticias del sector y de las iniciativas de Panorama Minero?


Suscribite a nuestro boletín.

Illustrative image for the news: Caleras San Juan Increases Capacity of Its Photovoltaic Park | Panorama Minero

Caleras San Juan Increases Capacity of Its Photovoltaic Park

Caleras San Juan signed a new credit agreement aimed at financing the expansion of its photovoltaic plant located in Cienaguita, Department of Sarmiento. This involves funds totaling US$3 million. It is a financial credit line specifically intended for solar parks associated with the global energy transition.

Leer más